{"id":1890,"date":"2021-10-11T14:05:00","date_gmt":"2021-10-11T07:05:00","guid":{"rendered":"https:\/\/tlmarine.vn\/?p=1890"},"modified":"2021-10-11T14:05:00","modified_gmt":"2021-10-11T07:05:00","slug":"pvtrans-vung-tau-received-pvt-dawn-in-vung-tau","status":"publish","type":"post","link":"https:\/\/old.tlmarine.vn\/?p=1890","title":{"rendered":"PVTrans Vung Tau received PVT Dawn in Vung Tau"},"content":{"rendered":"\n<p>Thang Long Maritime is pleased to announce the completion of a purchase a 13,000 DWT chemical &amp; oil carrier.<\/p>\n\n\n\n<p>On March 1, 2021, PVTrans Vung Tau (Thang Long Maritime) &#8211; a subsidiary of PetroVietnam Transportation Corporation (PVTrans) has completed the reception of the vessel PVT DAWN.<\/p>\n\n\n\n<p>PVT DAWN was built in 2009 in Korea.\u00a0This is an oil\/chemical tanker with a gross tonnage of 13,094 MT.\u00a0The vessel has good and modern technical conditions, meeting the strict standards of the maritime industry and major oil and gas customers in the world.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/petrovietnam.petrotimes.vn\/stores\/news_dataimages\/lemaiphuong\/032021\/03\/16\/2406_PVT_Dawn.jpg?rt=20210303162408\" alt=\"Oh PVT Dawn.\"\/><figcaption>PVT Dawn<\/figcaption><\/figure>\n\n\n\n<p>The receipt of PVT DAWN is part of PVTrans&#8217; overall plan on fleet rejuvenation strategy, anticipating the recovery of the shipping market, which is expected at the end of 2021 and early 2022 after the COVID-19 pandemic is brought under control on over the world.<\/p>\n\n\n\n<p>With modern technical characteristics, PVT DAWN will be operated in the international market. This event confirms PVTrans&#8217;s position in meeting the strict standards of large terminals and Oil Majors as well as its ability to gradually improve its specialization in ship management and operation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Thang Long Maritime is pleased to announce the completion of a purchase a 13,000 DWT chemical &amp; oil carrier. On March 1, 2021, PVTrans Vung Tau (Thang Long Maritime) &#8211; [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[],"class_list":["post-1890","post","type-post","status-publish","format-standard","hentry","category-activities-news","cat-26-id"],"_links":{"self":[{"href":"https:\/\/old.tlmarine.vn\/index.php?rest_route=\/wp\/v2\/posts\/1890","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/old.tlmarine.vn\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/old.tlmarine.vn\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/old.tlmarine.vn\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/old.tlmarine.vn\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1890"}],"version-history":[{"count":2,"href":"https:\/\/old.tlmarine.vn\/index.php?rest_route=\/wp\/v2\/posts\/1890\/revisions"}],"predecessor-version":[{"id":1931,"href":"https:\/\/old.tlmarine.vn\/index.php?rest_route=\/wp\/v2\/posts\/1890\/revisions\/1931"}],"wp:attachment":[{"href":"https:\/\/old.tlmarine.vn\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1890"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/old.tlmarine.vn\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1890"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/old.tlmarine.vn\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1890"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}